Plug-grid PV
inverter has emerged in Australia
- what they are, how they work, you should also use one? PV inverter is an
electronic box will be solar panel array generates DC power (DC) into
alternating current (AC), applicable to home appliances, and transported to the
main grid.
Traditional
solar micro grid tie inverter solar modules can handle multiple output, usually installed in
the meter box nearby. Micro-inverter, is a recently developed a new type of
inverter, has a smaller size, can work with a single solar panel and
installation of solar panels on the back on the characteristics, creating a
commonly referred to as the AC solar panels.
In the family
system, install the most common photovoltaic inverter requires a qualified
electrician to operate, because they are qualified to the wire connected to the
meter.
The new
"plug and play" inverters are very different - it is a portable
device that can be solar panels or small wind turbines connected to the
inverter, then directly into the family standard power inverter socket;
electricity for home appliances. Although less than a standard residential
solar inverter capacity size, but can be used multiple units.
It sounds like
a great idea, but consumers considering the purchase of plug and play grid
inverter may need to be careful. In a forum on energy issues discussed at the
problem, which is one point to mention, although Clean Energy Commission (CEC)
will plug the inverter marketed renewable energy certificates and obtain
approval (RECs), but in a important safety standards, their certification still
seems doubtful.
AS-4777
standard, is handling the inverter connected to the grid energy systems and
networks in the world. In order to pass Clean Energy Commission (CEC) approved
listing of inverter "must AS 4777.2 and 3-2005 (or equivalent) and AS3100
(or equivalent) standard, in a suitable test lab to get tested."
However, in
AS4777.1 (installation requirements, Section 5.3.1 ),
it is clearly pointed out: "off grid inverter fixed wiring should be connected to
the distribution switch a dedicated circuit." If strict compliance with
the AS-4777, which seems to avoid the use of any type of plug and play devices.
Another important issue relates to the power distributor. Before the generator
can be connected to the grid (which includes your house to install solar panels
and electricity to the grid), to obtain the approval of dealers is a must. This
approval is not just a brief telephone or verbal, "Yes, you can do"
can decide - but need to have paperwork identified.
In addition,
the safety of these individuals has also been improved. Plug and Play with
anti-islanding inverter functions and features to prevent individuals continue
to provide power during a power outage (because electricity will continue to
supply two seconds). If the plug from the power outlet, it can still be
released instantly to mention electricity