This summer, Turpan photovoltaic plant a
sustained high temperatures , the maximum surface temperature of 65 ℃ .
To ensure the safety of power plants under high temperature conditions , stable
operation , Turpan company to take three measures to make photovoltaic power
plant generating equipment has been put into operation successfully passed the
first test of the hot weather in summer , in August generated a total of
3,301,300 kwh , creating a production the highest record since the monthly
energy and power generation projects in Xinjiang among the best in the same
scale .
First, a sound
system of work , increasing the daily inspection frequency. Surface temperature
of the component , the grid connected inverter room temperature , transformer oil to focus on
monitoring , periodic investigation, processing equipment operating problems ,
to ensure safe and stable operation of the equipment .
Second, do a solid
job repair and maintenance work . The company uses plant at night and rerouted
power outage , planned outage time line for power plant dc to ac power inverter room, high
voltage power distribution room, 35 kV bus for cleaning maintenance. Meanwhile,
the scientific development of equipment maintenance program , and reasonable
arrangements for battery components cleaning work to improve the power
generation efficiency .
Third, increase
troubleshooting efforts, timely registration , eliminating equipment defects .
Investigation on a regular basis , with a focus on the station's 440 combiner
box to sort out the investigation in a timely manner to eliminate safety
hazards , safe and stable operation of the power station basis .
As of August 27
, Turpan continuous safe operation of photovoltaic power plants 279 days , the
annual total generating capacity of 12,339,600 kwh , no equipment running
barriers and security incidents.